Projet MEGAWATT BURUNDI (89.5MW)

  • Your profile (NGO, company...)

    Point Focal de l'AREI pour le BURUNDI

  • Project category

    B

  • Estimated budget

    325000000

  • Capacity in MW

    89.5

Le Projet MEGAWATT BURUNDI (89.5MW) vise a amenager trente quantre (34) petites centrales reparties sur tout le territoire natoile pour avoir en totale 89.5MW. Ce projet pourra permettre d'acces a l'energie jusqu'a 60% de la population. Ces petites centrales seront isoles du reseau national et vont parvenir les populations rurales et les demunis. l'acces a l'energie sera garantie pour les femmes.

Economic and financial criterias

  • i. Ability to produce electricity or heat or other forms of energy for productive use in small and medium scale agriculture, manufacturing and community services.

    la production annuelle sera de 773 GWh

  • ii. Creation and maintenance of local jobs, whether for management positions and technical positions for assembly and maintenance of systems.

    L'emploi local est garantie sur toute l'etendue du pays

  • iii. Ability to stimulate economic diversification and growth (including local economic development)

    l'economie sera galopante

  • iv. Economic benefits occurring within a reasonable period of time (in case a loan has been contracted rather than a grant)

    la population rurale va se developper tres rapidement

  • v. Ability to raise funds to extend the project

    Le gouvernement pourra contribuer dans ce projet

  • vi. Ability to induce energy market transformation, innovation and cost reduction

    Le marche de l'energie va connaitre la revolution vu le cout faire de l'energie hydroelectrique

  • vii. Accessibility at an affordable price for the majority of consumers

    prix tres faible

  • viii. Joint financing agreements (a factor demonstrating the willingness to carry out the project)

    requete de financement

Social criterias

  • i. Empowerment of women

    Les femmes auront acces a l'energie

  • ii. Involvement of local stakeholders and civil society

    garantie

  • iii. Proof of social acceptance and local ownership

    acceptation sociale et de l’appropriation locale garantie

  • iv. Improving equity in access to energy and promoting energy democracy

    acces a l'energie pour tout le monde

  • v. Respect for human rights and the rights of indigenous peoples

    Respect absolu des droits humains et des droits des autochtones

Environmental criteria

  • i. Impact on greenhouse gas emissions, including carbon dioxide and methane

    Pas d'emission des gaz a effet de serre

  • ii. Impacts on local ecosystems and ecosystem services

    les ecosystemes sont proteges. Les petites centrales sont ecologiques

  • iii. Impacts on land use and other land use impacts

    pas d'occupation des terres

  • iv. Recyclable nature of technologies exploiting renewable energies

    recyclable

  • v. Any other environmental criterion required by the national regulations / legislation in force

    l'environnement est proteges

Institutional criteria Part 1

  • i. Compliance of the project with the priorities of the country concerned / region, without objection from other affected and affected countries, especially if the project has cross-border scope

    Ce projet entre dans le plan nationale de developpement du BURUNDI 2018-2027 (PND)

  • ii. Synergy with ongoing / planned activities in the country (to avoid redundancies and incompatibilities during the implementation phase, while facilitating the healthy diversity of stakeholders and actions)

    Synergie garantie

  • iii. Applicant's current capabilities, and track record demonstrating his ability to successfully complete the project, particularly with respect to his environmental and social duty of care

    requette de financement

  • iv. Reproducibility

    disponible

  • v. Durability

    garantie par les services d' exploitation

Technical criterias

  • i. Robust technical design

    la conception technique solide

  • ii. Robustness and risk of failure / maintenance requirements

    les risques sont partages

  • iii. Degree in which manufacture / assembly is carried out on national or African soil

    importation de quelques equipements le reste s'achetent en Afrique

  • iv. Capacity of the network (main and / or mini-grid) to absorb the production of power plants exploiting renewable energies and to absorb a variable energy yield

    capacite garantie

Project Follow Up

  • Lead financier

    a chercher

  • Co-financier (if applicable)

    a chercher

  • Budget Total en Millions d’Euros

    361 Mio USD

  • Equity in Millions of Euros

  • Financial Products

  • Project status

    Etude de prefaisabilite et de faisabilite disponible , requete de financement