Madagascar: Electrification of rural regions through renewable energies, Sava region, Phase II

  • Project category

    Production ERn B,C

  • Estimated budget

    12800000

  • Capacity in MW

    6

Supplying regional centres with renewable energies; mini grids

Economic and financial criterias

  • i. Ability to produce electricity or heat or other forms of energy for productive use in small and medium scale agriculture, manufacturing and community services.

  • ii. Creation and maintenance of local jobs, whether for management positions and technical positions for assembly and maintenance of systems.

  • iii. Ability to stimulate economic diversification and growth (including local economic development)

    Germany

  • iv. Economic benefits occurring within a reasonable period of time (in case a loan has been contracted rather than a grant)

    RSE Generation

  • v. Ability to raise funds to extend the project

    310000000 Euros

  • vi. Ability to induce energy market transformation, innovation and cost reduction

  • vii. Accessibility at an affordable price for the majority of consumers

  • viii. Joint financing agreements (a factor demonstrating the willingness to carry out the project)

Social criterias

  • i. Empowerment of women

  • ii. Involvement of local stakeholders and civil society

  • iii. Proof of social acceptance and local ownership

    Germany

  • iv. Improving equity in access to energy and promoting energy democracy

    RSE Generation

  • v. Respect for human rights and the rights of indigenous peoples

    310000000 Euros

Environmental criteria

  • i. Impact on greenhouse gas emissions, including carbon dioxide and methane

  • ii. Impacts on local ecosystems and ecosystem services

  • iii. Impacts on land use and other land use impacts

    Germany

  • iv. Recyclable nature of technologies exploiting renewable energies

    RSE Generation

  • v. Any other environmental criterion required by the national regulations / legislation in force

    310000000 Euros

Institutional criteria Part 1

  • i. Compliance of the project with the priorities of the country concerned / region, without objection from other affected and affected countries, especially if the project has cross-border scope

  • ii. Synergy with ongoing / planned activities in the country (to avoid redundancies and incompatibilities during the implementation phase, while facilitating the healthy diversity of stakeholders and actions)

  • iii. Applicant's current capabilities, and track record demonstrating his ability to successfully complete the project, particularly with respect to his environmental and social duty of care

    Germany

  • iv. Reproducibility

    RSE Generation

  • v. Durability

Institutional criteria Part 2

  • i. Detailed plan for mobilizing existing capacities

  • ii. Detailed plan, including resources needed, for the development of additional capabilities (to fill the gaps identified in subsection d.iv)

Technical criterias

  • i. Robust technical design

  • ii. Robustness and risk of failure / maintenance requirements

  • iii. Degree in which manufacture / assembly is carried out on national or African soil

    Germany

  • iv. Capacity of the network (main and / or mini-grid) to absorb the production of power plants exploiting renewable energies and to absorb a variable energy yield

    RSE Generation

Project Follow Up

  • Lead financier

    KfW Development Bank

  • Co-financier (if applicable)

  • Budget Total en Millions d’Euros

    12.8

  • Equity in Millions of Euros

  • Financial Products

  • Project status

  • Technique Assistance in Millions Euros

PROJECTS B

ADOPTED

AREAS COUNTRIES
    TECHNOLOGY